E-mail:
info@sealontech.com
Office:
Address: 1109 Glen Eagle Drive,
Aurora, IL, 60502,
U.S.A.
Manufacturing Facility:
Address: 309 Xinli Road,
Xindu District,
Chengdu, Sichuan, 610500, China

We would be more than happy to hear from you, whether you are an existing customer, or you are looking for a part contractor for your business needs. If you have specific questions about how to request for quote, please see below. If you still have more question, please get in touch with us.

Request For Quote

Request for quote process is slightly different depends on whether you already have a detailed part specification and mechanical drawing.

When you have part specification and / or mechnical drawing ...

then it is fairly straight-forward, please email us the specification, the mechanical drawing, along with the volume and the timeline you are expecting to receive the products, we will try to get a quote for price back within three business days. It should be mostly much shorter than that time, but it could take longer because sometime we need to ensure that we have all raw material needed for your products.

When you do not have detailed specification / mechanical drawing ...

usually this is a relatively longer and much involved process, because we need to work together to lay out the specification and possibly design a solution for your need before we can get a quote for price.